If you’ve been to Colchester village over the summer, you’ve probably noticed the cherry picker and a giant Dumpster parked next to the United Church of Colchester.
A crew just finished worked on the roof of the church, both inside and outside to repair truss damage and make it safe again. Civil engineer John Treybal, son of church member Sally Stremlau, recommended experienced historic renovation company Building Heritage.
The construction included replacing failed trusses damaged from rot and overloading; adding steel reinforcements for window lintels; removing attic insulation; installing a standing seam roof; replacing loose ceiling boards and repainting the sanctuary ceiling and repainting the interior plaster walls.
The work ensures the church is stabilized for another 150 years, a church press release said. The congregation has been there since 1838.
“With extensive plaster and painting work inside and cleaning efforts, both professional and congregational, we are ready to open the doors once again,” the release said. “The church received additional financial assistance from the Preservation Trust of Vermont, anonymous donors and generous church members.”
The church celebrated the reopening with a ceremony on September 11, with the Rev. Russell Willis, interim pastor, conducting. The congregation provided a potluck dinner afterward.
The United Church of Colchester is located at 900 Main St., next to Burnham Library. The church is associated with the Vermont/New Hampshire Baptist Convention.
Comments
No comments on this item Please log in to comment by clicking here