Recreation Advisory Board unveils first look at Colchester Recreation Center to applause from residents in attendance

Posted

Around two decades in the making, the Colchester Recreation Advisory Board unveiled the first looks at a new Colchester Recreation Center.

At the Colchester selectboard meeting Sept. 27, a packed room of Colchester residents applauded the standing Recreation Advisory Board members and Recreation Director Glenn Cuttita following a presentation showing the design of the Colchester Recreation Center.

The history of the Recreation Center initiative begins when the first committee on the topic was formed in 2002, but that committee lost steam as the selectboard focused on the new town offices, said Recreation Advisory Board chair Adriane Martin.

In 2009, another committee was formed but again recreation took a back seat to other projects with the Town Hall, the Police Department and the Public Works Garage.

The actual property where the facility is planned to be built, the Bayside/Hazlett property, was purchased in 2004 for $1.1 million. The Recreation Center was the most popular use for the property.

Plans for the facility show a road right across from Laker Lane leading to a parking lot with the center at the end.

Inside is complete with a lobby area featuring a kitchen where food sales could occur and a glass walled hallways where you’d be able to look into the gymnasium, said Cuttitta.

The gymnasium features one full court that could be separated into two smaller courts giving the space the ability to adapt from basketball to pickle ball to indoor soccer. Running around above the court on the second floor is a 1/16 mile running track.

Also on the first floor is a multipurpose space where parties or gatherings could occur.

In addition to the track on the second floor, is another multi-purpose space for aerobics, yoga or spinning classes and a proper gym with cardio equipment and weights.

The facility also allows for phases of construction, meaning the second phase could mean an indoor pool at some point.

In addition the facility would rely heavily on solar power with not only solar panels on top but also a large solar panel sitting off the parking lot on its own.

The group in attendance at the meeting was enthusiastic and excited about the plans, which some have been working on and waiting for since the initial push 20 years ago.

Colchester resident Jack Pecor said the facility is greatly needed. He said he built a batting cage and indoor basketball court in the barn on his property.

“Right now, at this very moment, there are kids in the batting cage having batting practice,” he said. “In the winter time it's used every night of the week. This is sorely needed, I think the town needs it.“

Shelburne recreation director and Colchester resident Betsy Cieplicki said she’s seen first hand how a recreation facility gets used by a community in lieu of the Shelburne Fieldhouse.

Cieplicki said it's great to see that the facility has all people in mind, young and old.

Colchester Town Manager Aaron Frank said the goal is to ready the project to the point where town staff could recommend it to be put on the ballot for 2023 Town Meeting Day.

#csnltop

Comments

No comments on this item Please log in to comment by clicking here