COLCHESTER — A new inn and restaurant could be coming to Malletts Bay.
Hazelett Casting Corporation brought the proposal to Colchester’s Development Review Board for a second hearing April 9. Four consultants representing Hazelett answered questions from the board and members of the public.
According to the site plan application, the development would be located at 166 and 180 West Lakeshore Drive and include a 48-seat restaurant and four cottage-style buildings. A total of 19 guest rooms would include studio units and one- and two- bedroom suites.
Situated on the lakefront, the property is currently a marina and recreational space for Hazelett employees. That use would remain in addition to the new builds.
New parking would be constructed across the street at 135 West Lakeshore Drive as part of a separate site plan application for that parcel.
Benjamin Avery, from Greenfield Growth Consulting, told the board the project — called “The H” — aims to exist in harmony with the existing community and surrounding area.
“We're acutely aware of the importance of the corridor to the town, to the community that's here tonight, as well as to the landowner,” he said. “It's our goal to construct a hospitality project that serves today's needs and the coming growth in Malletts Bay.”
All proposed buildings would be two-stories in height, adhering to the town’s height limitations. Community event and meeting space is planned for the main floor of the restaurant building. Spa amenities are set for the upper level.
Jessica Gasek, a consultant with Scott and Partners, spoke to how the inn was designed aesthetically, especially for visitors approaching the inn and restaurant by boat.
“We wanted the building to be visible, appealing and instantly recognizable from a distance, making the arrival by boat its own event, as one sees the destination from afar and continues to approach, knowing that this is a special place worthy of the effort,” she said.
Gasek said the project will preserve lake views by utilizing large windows.
“These desires translated into large expanses of glass that will shine like a beacon at night…sparkle when it catches the sun during the day, all supported by a strong base of stone, as these structures appear to rise out of the slope,” she said.
Responding to board concerns last meeting, Avery brought forward new plans to simplify the landscaping by regrading the slope to the lake to make a natural descent into the water, instead of adding more usable outdoor space and walls that would complicate the design.
Additional benefits of this plan would include better access to planting and reduced erosion, he said.
In its preliminary review of the property, Krebs & Lansing Consulting Engineers state the property is “well suited for the type of development proposed.” There are no wetlands, natural areas or areas prone to flooding.
Members of the public weighed in after the consultants answered questions from town staff and members of the DRB about stormwater management, the hill grading and design of the structures.
Resident Frank Connors, asked why the project couldn’t be moved across the street, opposite the lakeshore.
“Why can't the project get moved across the street on the same side as the industrial site?” he said while noting the marina would be better without hotel guests watching it.
Avery said the owner’s vision was to take advantage of the lakeshore for the project.
Resident Katie Backus shared reservations at the possibility of having the development by the lake.
“I was driving here today, and I got to take in Mount Mansfield, covered in snow again, and the beautiful view of the lake,” she said. “I do have to share disappointment in seeing this level of development on such a small parcel of land in such a heavily trafficked area already.”
The next public hearing for the project is planned for a Development Review Board meeting at 7 p.m. on Wednesday, May 28 at the Town Offices.
Comments
No comments on this item Please log in to comment by clicking here