Diverging Diamond Interchange to open at Interstate 89’s Exit 16; traffic pattern to change

Posted

COLCHESTER — The Diverging Diamond Interchange is slated to open in mid-September, and drivers will notice a change in how they navigate Exit 16.

In the coming weeks, the new traffic pattern will briefly shift vehicles to the left side of the roadway as they travel through the interchange. The design allows drivers turning left onto interstate entrance ramps to do so without crossing oncoming traffic. Once through the interchange, traffic returns to the normal right side of the roadway. Traffic signals will control both crossover points.

According to the Vermont Agency of Transportation, the benefits of this design include enhancing pedestrian and biker safety with shorter crossing distances and clearer paths and reducing congestion by letting left-turning vehicles move more freely. 

VTrans will be available at the Champlain Valley Fair until Sept. 6 to answer questions, provide project updates and address concerns about the upcoming traffic changes. Visitors can also try the project's driving simulator and experience the future interchange before the new traffic pattern is implemented later this month.

Comments

No comments on this item Please log in to comment by clicking here