Colchester traffic report: what to know about the Malletts Bay Sewer Project and other road construction projects

Posted

According to the Chittenden County Regional Planning Commission, the Malletts Bay Sewer Project on West Lakeshore Drive between The Moorings Marina at 332 West Lakeshore Drive and the Bayside intersection/Blakely Road will cause delays and alternating one-lane traffic during the week between 6 a.m.-4 p.m. and 9 p.m.-6 a.m. Motorists are encouraged to seek other routes when traveling through the area. Construction on Blakely Road around the Town Office complex at 781 Blakely Road will cause occasional lane closures during the week from 7 a.m.-5 p.m. Traffic control will be present, and this project is planned to be completed in 2027. 

According to the Vermont Agency of Transportation, from Tuesday, September 3, through Friday, September 6, Interstate 89 will be reduced to a single lane in both directions near Exit 17 during off-peak hours: 6 a.m.-3 p.m. on Interstate 89 northbound and 9 a.m.-8 p.m. on Interstate 89 southbound. The Interstate 89 northbound off-ramp slip lane for turning right onto U.S. Route 2 westbound will be temporarily closed for bridge construction until the winter shutdown. Motorists can turn right or left onto U.S. Route 2 at the signalized intersection of the Interstate 89 northbound off-ramp and U.S. Route 2. between the bridge over Interstate 89 and Jasper Mine Road, will have a single-lane closure with alternating one-way traffic controlled by flaggers from 9 a.m.-3 p.m. There will be a lane shift on U.S. Route 7 between the Shell Gas Station and Wiley Road.

According to the Chittenden County Regional Planning Commission, work to reconfigure the existing tight diamond interchange to a Diverging Diamond Interchange at Interstate 89 Exit 16 will cause intermittent shoulder and lane closures along US Routes 2 and 7 between Sunderland Woods Road and South Park Drive during the week from 6 a.m.-6 p.m. for the next several months. Traffic control will be present, and motorists are encouraged to use caution while traveling through the work zone. 

Keep in mind that weather and other factors may affect the speed and activities of construction.

Comments

No comments on this item Please log in to comment by clicking here